Polyeco™ GR thermoplastic polyolefin (TPO) waterproofing membrane

Scope of application

It is suitable for planting waterproof projects such as roof garden, planting roof, planting roof, municipal greening and so on.

Product specifications

Model

Thickness(mm)

Wide(m)

Length(m)

Lap edges

Execution standards

H-type (average material)

1.2、1.5

2.0

20

Weld

GB27789-2011

Type P (fabric reinforced)

GB/T35468-2017

 

Product features

1. It has excellent root puncture resistance, can avoid plant roots penetrating the waterproof layer, and can be used in complex underground environments;

2. It has excellent welding performance, which can greatly improve the root resistance, waterproofing and sealing stability of the lap joint;

3. No heavy metals or other harmful components to plant roots, recyclable, good environmental performance;

4. Resistant to mold and algae and other microorganisms;

5. Resistant to acid, alkali, salt and lubricating oil corrosion;

6. Reduce the urban heat island effect, increase comfort space, and improve rainwater management.

Technical indicators

Executive standard: GB27789-2011 "Thermoplastic polyolefin (TPO) waterproofing membrane"
project index
H L P
The thickness of the resin layer on the intermediate tire base/mm ≥ - - 0.4

Tensile properties
Maximum tensile force/ (N/cm) ≥ - 200 250
Tensile strength/MPa ≥ 12.0 - -
Elongation at maximum tensile force/% ≥ - - 15
Elongation at break/% ≥ 500 250 -
Low temperature bending -40°C without cracks
Seam peel strength/ (N/mm) ≥ 4.0 or coil destruction 3.0
Right angle tear strength/ (N/mm) ≥ 60 - -
Executive standard: GB/T35468-2017 "Root-piercing waterproofing membrane for planting roofing"
project index
Resistant to mold and corrosion Anti-mildew grade Level 0 or 1
Seam peel strength No processing(/ N/mm) Plastic waterproofing membrane weld ≥ 3.0 or coil damage
Bond ≥1.5
Retention rate after heat aging treatment/% ≥80 or coil destruction

Construction steps

Full adhesion method: base layer cleaning → pre-laid coil → large surface gluing → laying coil → lap treatment → node strengthening → closing treatment → self-inspection and receipt

Empty paving method: base layer cleaning → pre-laid coil → lap treatment → node reinforcement → self-inspection and acceptance 

Case show

Xinxiang City Activity Staff Center

新乡市